E60 Build Timeline

Thread Tools
 
Search this Thread
 
Old 01-31-2008, 05:02 PM
  #1  
Contributors
Thread Starter
 
westcoast550's Avatar
 
Join Date: Apr 2007
Location: Vancouver, BC , Canada
Posts: 4,459
Likes: 0
Received 0 Likes on 0 Posts
My Ride: 2011, X6 Hybrid . Alpine White , every option. 20" Conti' NON runflats,OEM trunk spoiler , LUX V3 AE's , HP Thunder Fogs , custom front bumper reflector delete........
Default

Can someone direct me to the build timeline and process flow for the build out of an e 60. I know I've seen it here but my searches haven't been fruitful. I was just advised that my car is Status 51, I have a production # but there is no tracking service for Canadian customers (BMW Canada tells me ).

Thanks
Old 01-31-2008, 05:30 PM
  #2  
Senior Members
 
tuco's Avatar
 
Join Date: Sep 2007
Location: Kelowna, BC, Canada
Posts: 319
Likes: 0
Received 0 Likes on 0 Posts
Default

Originally Posted by westcoast550' post='525632' date='Jan 31 2008, 06:02 PM
Can someone direct me to the build timeline and process flow for the build out of an e 60. I know I've seen it here but my searches haven't been fruitful. I was just advised that my car is Status 51, I have a production # but there is no tracking service for Canadian customers (BMW Canada tells me ).

Thanks
K - isn't there a FAQ section on here some where, I recall it.

In Canada, your dealer (and your's is a good one) is your only real source of info - they can tell you pretty much daily at what stage your car is at, BUT the info they access sometimes doesn't change for days at a time. I found that checking about every 7 to 10 days worked best, that way you don't "pester" them constantly, and often in that time frame, changes in status can occur. More detailed tracking is not available for Cdn orders (to the best of my knowledge).

You should have a "build week" slated if you have a Production # now.
Old 01-31-2008, 05:33 PM
  #3  
ObD
Contributors
 
ObD's Avatar
 
Join Date: Aug 2007
Location: Boston, MA
Posts: 827
Likes: 0
Received 0 Likes on 0 Posts
My Ride: 2008 535i 6MT
Default

http://forums.e60.net/index.php?showtopic=2116
Old 01-31-2008, 07:51 PM
  #4  
Contributors
Thread Starter
 
westcoast550's Avatar
 
Join Date: Apr 2007
Location: Vancouver, BC , Canada
Posts: 4,459
Likes: 0
Received 0 Likes on 0 Posts
My Ride: 2011, X6 Hybrid . Alpine White , every option. 20" Conti' NON runflats,OEM trunk spoiler , LUX V3 AE's , HP Thunder Fogs , custom front bumper reflector delete........
Default

Thanks Tuco and ObD , I'll check those sources out ......

Cheers
Old 01-31-2008, 08:06 PM
  #5  
Senior Members
 
JSpira's Avatar
 
Join Date: Feb 2007
Location: New York und Wien
Posts: 2,158
Likes: 0
Received 0 Likes on 0 Posts
Default

Originally Posted by westcoast550' post='525632' date='Jan 31 2008, 09:02 PM
Can someone direct me to the build timeline and process flow for the build out of an e 60. I know I've seen it here but my searches haven't been fruitful. I was just advised that my car is Status 51, I have a production # but there is no tracking service for Canadian customers (BMW Canada tells me ).

Thanks

112 is the last status at which you can make changes and that is before production starts. So your car has either not started or it?s not at 51 (I don?t recall seeing anyone at Status 51 come to think of it).

Maybe it?s at Status 151?
Old 02-01-2008, 03:45 PM
  #6  
Senior Members
 
calpalmer's Avatar
 
Join Date: Dec 2007
Location: Western Washington
Posts: 538
Likes: 0
Received 0 Likes on 0 Posts
My Ride: 2008 Space Gray 550i, Light Poplar Wood, Anthracite Head Liner, Sport Package, Sport Automatic Transmission, Cold Weather Package, Front Ventilated Comfort Seats in Black Nasca Leather, NAV, HUD, Active Steering, Comfort Access, Night Vision, Lane Deviation Warning, Active Cruise Control, Heated Rear Seats, Folding Rear Seats, Power Shade w/ Rear Side-Shades, Rear Air Bags, Logic 7, HD Radio, Sirius Satellite Radio, iPod/USB Adapter. Car in BMW Body Shop, estimated completion 01/24/07.
Default

I have sure been pleasantly surprised at the schedule of my new car so far! I ordered it on 1/2/08, scheduled to be built in week 7 (mid Feb) instead of a dealer's stock order, was actually into production on 1/17, completed on 1/24, and at the port awaiting a vessel on 1/28! Hard to believe that rapid a schedule -- especially in light of the ship tilt that wrecked so many others. I'd have thought that if anything those of us in the pipeline would have been slipped back some, not accelerated.

All good,

Cal
Old 02-01-2008, 03:52 PM
  #7  
Senior Members
 
JSpira's Avatar
 
Join Date: Feb 2007
Location: New York und Wien
Posts: 2,158
Likes: 0
Received 0 Likes on 0 Posts
Default

That sounds about right although nothing beats the schedule my 2006 had:
10. July 2006 - ordered
17. July 2006 - built
31. July 2006 - delivery
Old 02-01-2008, 04:01 PM
  #8  
Senior Members
 
calpalmer's Avatar
 
Join Date: Dec 2007
Location: Western Washington
Posts: 538
Likes: 0
Received 0 Likes on 0 Posts
My Ride: 2008 Space Gray 550i, Light Poplar Wood, Anthracite Head Liner, Sport Package, Sport Automatic Transmission, Cold Weather Package, Front Ventilated Comfort Seats in Black Nasca Leather, NAV, HUD, Active Steering, Comfort Access, Night Vision, Lane Deviation Warning, Active Cruise Control, Heated Rear Seats, Folding Rear Seats, Power Shade w/ Rear Side-Shades, Rear Air Bags, Logic 7, HD Radio, Sirius Satellite Radio, iPod/USB Adapter. Car in BMW Body Shop, estimated completion 01/24/07.
Default

Yeah, but now I guess there's not much getting around the 30-45 days of transit from Germany to Washington State....
Old 02-01-2008, 05:07 PM
  #9  
Contributors
 
JeffNNJ's Avatar
 
Join Date: Apr 2006
Location: Northern NJ, USA
Posts: 1,102
Likes: 0
Received 0 Likes on 0 Posts
My Ride: 2011 M3 Convertible, Alpine White/black, 6 speed 2011 535xi Tasmin Green, Venetian Beige
Default

I call the toll free number and enter my production order number once a day just to check what phase it is in. Yesterday and today it was in the paint shop. I do this purely for curiosity because I really don't care when the car arrives. My current lease is up the end of April so I'm really not in any hurry. Another fun thing to do is to look at the Dingolfing virtual factory tour http://www.bmw-plant-dingolfing.com/dingol...m/en/index.html That was you can get an idea of exactly what's going on in each production phase. Word of advice: Let each section load with the sound off, then watch it after it completes. Otherwise it's really choppy and annoying.
Old 02-01-2008, 07:58 PM
  #10  
Contributors
 
pennetta's Avatar
 
Join Date: Mar 2004
Location: Long Island, NY
Posts: 2,303
Likes: 0
Received 1 Like on 1 Post
My Ride: 2008 535i: June 6th start build, complete June 17th, at NY Port July 5th, at dealer July 10th, took delivery Friday July 13- Plantimum Bronze/Natural Brown Leather/Light Poplar, Sport Package, Sport Auto, Active Steering, Premium Package, CWP & PDC. Dinan Performance Software 384hp & 421 ft/lbs.
Default

Originally Posted by westcoast550' post='525632' date='Jan 31 2008, 09:02 PM
Can someone direct me to the build timeline and process flow for the build out of an e 60. I know I've seen it here but my searches haven't been fruitful. I was just advised that my car is Status 51, I have a production # but there is no tracking service for Canadian customers (BMW Canada tells me ).

Thanks
Look at my signature. It show for both my 545 and 535 with exact dates for a New York delivery.